Barry
took the header tank to his welder after cleaning it up further and finding two
more holes.
The bottom of the tank was paper thin in places and this was cut
away by the welder and a 6mm piece of aluminium was welded in place, with a boss for
a drain plug in addition and what an excellent job he made of it too. The tank was further cleaned out with descaler and
the tubes cleaned out with an extended drill bit, before flushing out what was
left.
(All photos by Barry Adams)
All
that remains to be done now, is to bolt it back in place for the next trip to
load up with coal for the NBT Summer Coal Run.
No comments:
Post a Comment